Contractors who have been introduced to Pillar and used it on a job just once, even in the middle of a project, can't imagine building without it.
Wood buildings? ... "use the temperature info to help find
and stop potential pre-fire conditions,” Jeff says.
DJ Keating installed Pillar in the middle of the project. Prevented burst pipes through out the winter.
Temperature, humidity, dust,& sound levels were all monitored to protect patients, workers, pipes and finishes.
Invisible problem of humidity and it's effect on the gym floor installation accounted for 95% of the savings in the first 3 months alone.