Visit our website
  • Home
  • WINTER PREP
  • Library
  • Contact
SUBSCRIBE FOR UPDATES
CALL NOW

"Can't Imagine Building Without it."

Contractors who have been introduced to Pillar and used it on a job just once, even in the middle of a project, can't imagine building without it.

Book a call with our team today - or TXT (408) 969-3273
CALL NOW
Open document

Wood buildings? ... "use the temperature info to help find

and stop potential pre-fire conditions,” Jeff says.

READ ON >>
Open document

DJ Keating installed Pillar in the middle of the project. Prevented burst pipes through out the winter.

READ ON >>
Open document

Temperature, humidity, dust,& sound levels were all monitored to protect patients, workers, pipes and finishes.

READ ON >>
Open document

Invisible problem of humidity and it's effect on the gym floor installation accounted for 95% of the savings in the first 3 months alone.

READ ON >>
  • Home
  • WINTER PREP
  • Library
  • Contact
GetResponse